Current site: Peikko United Kingdom. Do you want to change country or language?

STOA169 Portico, Polling, Germany

  • Building Type:
  • Education & Culture
  • Other Public Buildings
Fullscreen map Close Street View

OVER 100 ARTISTS FROM ALL CONTINENTS DESIGN COLUMNS FOR STOA169

A hall of art in the middle of nature, supported by over 100 individually designed columns, created by internationally renowned artists from all over the world: the artist Bernd Zimmer has been pursuing this idea and its realisation for almost 30 years.

On a part of an agricultural meadow near the village of Polling, on the banks of the river Ammer, in the middle of Pfaffenwinkel, an open columned hall is being built: the STOA169. Artists from all continents were selected to design one column each, which together, as an archive of today's art, would carry the common roof of the STOA169.

The artist Bernd Zimmer developed the idea for this project already in 1990 on a journey through South India. The impressive porticoes of the Hindu temples, where each column is individually shaped, inspired him to the idea of the STOA169. The STOA169 sets a common sign for worldwide peaceful coexistence, solidarity, international understanding and respect for nature.

Visitors can only reach the columned hall on foot. From the car park near the railway station, it takes about ten minutes to walk up the Ammer in the most beautiful surroundings along a path that can be used for agriculture to a closed river loop. There, the view to the columned hall opens up. "It is important to me that in this place the uniqueness of nature can be perceived simultaneously with art," says Bernd Zimmer.

Anchor bolts and special anchor plates are used in this project.These components serve to connect the capital to the column quickly and easily. The anchor bolts are concreted in at the head of the columns and the anchor plates within the capitals. After concreting, the capital can be screwed directly to the protruding anchor bolts of the column.  After screwing, the components are grouted. By using the anchor bolts and special anchor plates a fast construction process could be guaranteed. In addition, costly formwork work on the construction site was avoided.

Read more down-arrow.png

Our technical support team did an excellent job in a very short time.

Ottmar Walter

Project facts

Developer:
STOA169 Stiftung
Construction Company:
Hönninger Betonfertigteil GmbH
Architect:
Künstler/Artist: Bernd Zimmer
Precaster:
Hönninger Betonfertigteil GmbH
Delivery year:
2020
Completion year:
2020

Talk to our experts